Today we finished placing the foundation blocks and wiring the vertical sections of rebar together today. The floor will be five blocks above the ground on one side. It will be awkward to pour them all full of concrete tomorrow. The lot is large and flat so passing buckets shouldn't be too hard. Lifting buckets above waist height will be tiring for the person emptying them into the blocks. We went to the beach or La Playas today to check out the border scene. It seemed to be as crowded as a Sunday with lots of multi-generation families visiting. We went to a restaurant and most of the people coming in were masked up even grade school aged children. Our worksite is to the south of Tijuana so we found out there is a new road through a tunnel that gives you a short cut to the beach.